Project: Hilton Garden Inn Heathrow

Project Details

  • Site: Hilton Garden Inn Heathrow
  • Client: Pandox
  • Project: Refurbishment to 364 Bedroom/Bathroom, Reception, Bar, Restaurant, Meeting Rooms and Hilton Shop
  • Value: £2,500,000
  • Duration: 30 weeks

Brief Description

  • Project run as 2 separate work streams being ‘Bedrooms’ and ‘Public Areas’
  • Refurbishment to 364 Bedrooms to two grades (Queen Rooms & King Rooms)
  • Full redecorations to both rooms types.
  • New decorative lighting and USB switch plates to bedside
  • Queen Bathrooms consisting of new tiled floor, new bespoke vanity unit, new bath panel, new WC and cistern and new brassware throughout
  • King Bathrooms consisting of full retile, new shower enclosures, new bespoke vanity unit, new dropped ceiling with downlights, new WC and cistern and new brassware throughout
  • Restaurant consisting of new bespoke joinery items, redecorations and electrical alterations
  • Bar Area consisting of over cladding existing bar front and top, bespoke joinery items, redecorations, electrical alterations and new flooring consisting of mixture of tiled and Karndean LVT
  • Reception consisting of over cladding of existing reception counters, redecorations, new tiled floor throughout and new decorative lighting
  • Gym consisting of redecorations, new lighting and new flooring
  • Meeting rooms consisting of redecorations, new flooring, foil/wrapping of existing credenzas and minor electrical alterations
  • Forming 2 new meeting rooms
  • Upgrade to existing Hilton Shop Area

Project: Crowne Plaza Stratford upon Avon

Project Details

  • Site: Crowne Plaza Stratford upon Avon
  • Client: Valor Hospitality
  • Project: Refurbishment to 200 Bedroom/Bathroom & Corridors
  • Value: £1,100,000
  • Duration: 16 weeks

Brief Description

  • Adaption to existing electrical supplies to suit designers new layout
  • Redecorations to all ceiling, walls and woodwork
  • Removal of existing carpets ready for clients own flooring contractor
  • Installation of new case goods into new rooms
  • Retile bathroom floors
  • Installation of new bulkheads to each bedroom lobby
  • Installation of new showers and basin taps
  • Manufacture and installation of new bath panels
  • Chemical clean, re-grout and re-silicone to all bathrooms
  • Decorations to complete corridors

Project: Milton Keynes Holiday Inn

Project Details

  • Site: Milton Keynes Holiday Inn
  • Client: LHM
  • Project: Open Lobby and MPW restaurant
  • Value: £450,000
  • Duration: 10 weeks

Brief Description

  • Removal of internal walls forming old admin offices to form one larger restaurant area
  • Hotels existing bar and lounge fully refurbished to new open lobby scheme
  • Old office space and restaurant fully refurbishment to form MPW restaurant within the new larger footprint
  • Manufacture all new bespoke joinery for both areas including two new bars, credenzas, waiter stations and open bookcases
  • New air conditioning and ventilation to MPW restaurant
  • Forming all new ceiling detail where offices removed
  • Complete new lighting design wired and installed with new lighting control system
  • Installation of new tiled and timber floors throughout whole ground floor
  • Manufacture and install slatted timber panelling to lounge and reception walls
  • Complete redecorations to all areas

Project: LGH Mock-Up Room

Project Details

  • Client: LGH
  • Project: New Group Mock-Up-Room
  • Value: £18,000
  • Duration: 4 weeks

Brief Description

  • Adaption to existing electrical supplies to suit designers new layout
  • Redecorations to all ceiling, walls and woodwork
  • Removal of existing carpets ready for clients own flooring contractor
  • Installation of new case goods into new rooms
  • Installation of new showers and basin taps
  • New shower panel & screen fitted
  • Manufacture and installation of new bath panels
  • Chemical clean, re-grout and re-silicone to all bathrooms
  • Decorations to complete corridors

Project: Radisson Blu Stansted Airport

Project Details

  • Site: Radisson Blu Stansted Airport
  • Client: Radisson
  • Project: Refurbishment to Ground Floor Lobby (Reception, Bar Area, Lounge Area)
  • Value: £650,000
  • Duration: 12 weeks

Brief Description

  • Phase refurbishment to complete ground floor open lobby area in a live hotel
  • Retiling to floor area in main reception using 1200 x 1200mm tiles
  • Cladding/Stone works to existing reception pods and reception back wall
  • New bespoke joinery items including Waiter Stations, Concierge Desk, Meeting & Events Host Desk
  • Complete new larger raised bar/lounge area which required all new timber structural works and new Hardwood timber floor on top
  • Redecorations to complete ground floor area
  • New decorative lighting installed to designers detail with new lighting control system
  • New air conditioning and ventilation system
  • Installation of woodgrain foil wrap to all perimeter wall panelling