Project: Refurbishment to 364 Bedroom/Bathroom, Reception, Bar, Restaurant, Meeting Rooms and Hilton Shop
Value: £2,500,000
Duration: 30 weeks
Brief Description
• Project run as 2 separate work streams being ‘Bedrooms’ and ‘Public Areas’
• Refurbishment to 364 Bedrooms to two grades (Queen Rooms & King Rooms)
• Full redecorations to both rooms types.
• New decorative lighting and USB switch plates to bedside
• Queen Bathrooms consisting of new tiled floor, new bespoke vanity unit, new bath panel, new WC and cistern and new brassware throughout
• King Bathrooms consisting of full retile, new shower enclosures, new bespoke vanity unit, new dropped ceiling with downlights, new WC and cistern and new brassware throughout
• Restaurant consisting of new bespoke joinery items, redecorations and electrical alterations
• Bar Area consisting of over cladding existing bar front and top, bespoke joinery items, redecorations, electrical alterations and new flooring consisting of mixture of tiled and Karndean LVT
• Reception consisting of over cladding of existing reception counters, redecorations, new tiled floor throughout and new decorative lighting
• Gym consisting of redecorations, new lighting and new flooring
• Meeting rooms consisting of redecorations, new flooring, foil/wrapping of existing credenzas and minor electrical alterations
• Forming 2 new meeting rooms
• Upgrade to existing Hilton Shop Area
Project: Crowne Plaza Stratford upon Avon
Project Details
Site: Crowne Plaza Stratford upon Avon
Client: Valor Hospitality
Project: Refurbishment to 200 Bedroom/Bathroom & Corridors
Value: £1,100,000
Duration: 16 weeks
Brief Description
• Adaption to existing electrical supplies to suit designers new layout
• Redecorations to all ceiling, walls and woodwork
• Removal of existing carpets ready for clients own flooring contractor
• Installation of new case goods into new rooms
• Retile bathroom floors
• Installation of new bulkheads to each bedroom lobby
• Installation of new showers and basin taps
• Manufacture and installation of new bath panels
• Chemical clean, re-grout and re-silicone to all bathrooms
• Decorations to complete corridors
Project: Milton Keynes Holiday Inn
Project Details
Site: Milton Keynes Holiday Inn
Client: LHM
Project: Open Lobby and MPW restaurant
Value: £450,000
Duration: 10 weeks
Brief Description
• Removal of internal walls forming old admin offices to form one larger restaurant area
• Hotels existing bar and lounge fully refurbished to new open lobby scheme
• Old office space and restaurant fully refurbishment to form MPW restaurant within the new larger footprint
• Manufacture all new bespoke joinery for both areas including two new bars, credenzas, waiter stations and open bookcases
• New air conditioning and ventilation to MPW restaurant
• Forming all new ceiling detail where offices removed
• Complete new lighting design wired and installed with new lighting control system
• Installation of new tiled and timber floors throughout whole ground floor
• Manufacture and install slatted timber panelling to lounge and reception walls
• Complete redecorations to all areas
Project: LGH Mock-Up Room
Project Details
Client: LGH
Project: New Group Mock-Up-Room
Value: £18,000
Duration: 4 weeks
Brief Description
• Adaption to existing electrical supplies to suit designers new layout
• Redecorations to all ceiling, walls and woodwork
• Removal of existing carpets ready for clients own flooring contractor
• Installation of new case goods into new rooms
• Installation of new showers and basin taps
• New shower panel & screen fitted
• Manufacture and installation of new bath panels
• Chemical clean, re-grout and re-silicone to all bathrooms
• Decorations to complete corridors
Project: Radisson Blu Stansted Airport
Project Details
Site: Radisson Blu Stansted Airport
Client: Radisson
Project: Refurbishment to Ground Floor Lobby (Reception, Bar Area, Lounge Area)
Value: £650,000
Duration: 12 weeks
Brief Description
• Phase refurbishment to complete ground floor open lobby area in a live hotel
• Retiling to floor area in main reception using 1200 x 1200mm tiles
• Cladding/Stone works to existing reception pods and reception back wall
• New bespoke joinery items including Waiter Stations, Concierge Desk, Meeting & Events Host Desk
• Complete new larger raised bar/lounge area which required all new timber structural works and new Hardwood timber floor on top
• Redecorations to complete ground floor area
• New decorative lighting installed to designers detail with new lighting control system
• New air conditioning and ventilation system
• Installation of woodgrain foil wrap to all perimeter wall panelling